Monday, July 18, 2005

Ready for moldings

At lunch today I went home and set up to start working on the chair rail and shoe moldings for the bedroom. I had to clean up the shop somewhat, set up the compound miter saw and an auxiliary support with a roller on top, and set up a work table for doing cope cuts. I hope to get everything cut and installed over 2 evenings. Then it's fill nail heads and caulk, then a little touch up paint. Should be moved back in before the weekend.

0 Comments:

Post a Comment

<< Home