Tuesday, August 09, 2005

Moving along.

The tropical room is coming along.
Last night I painted the second coat of "Java Sea" on the bottom of the walls and, when dry, removed all the blue masking. This time there is VERY little touch up to do. This morning I installed the receptacle plates.

Perhaps this evening, and some of tomorrow evening, the chair rail molding will be installed. Before installing the base shoe molding there is a part of the wood floor that I should repair. The floor is parquet wood tiles and a "quarter section" of tile slipped out of alignment before the glue dried. This left a pretty unsightly gap. The shoe molding will not cover that gap.

I need to get some touch up paint for the top part of the walls, sand down some spackle spots, and touch up those areas. And one of the closet doors has a hole that needs repairing. SHOULD be documenting some of this with photos. But will do that AFTER installing the chair rail.

Also last night I installed the shoe molding in the closet of the Master bedroom.

0 Comments: